[Construction Example] Boiler Replacement Work
Utilizing temporary scaffolding and lifting equipment! Introducing a case where boiler replacement work was completed while ensuring safety and precision.
Prevent troubles caused by "limited delivery routes that make transportation impossible" during equipment updates! We are currently distributing examples of completed renovation work that utilized temporary scaffolding and lifting equipment to ensure safety and precision in conjunction with the update of existing boilers. 【Recommended for these concerns】 ◆ The only access to the installation site is via stairs, with narrow and sloped routes ◆ Consideration is also needed for the integration with existing equipment For more details on the case studies, please check the catalog download. For inquiries about delivery conditions, on-site surveys, or details of past plant construction examples, feel free to "contact us via the web."
- Company:倉持鉄工
- Price:Other